Skip to content
English
  • There are no suggestions because the search field is empty.

When does a permit requirement apply?

A permit requirement may apply to installations that pose an increased risk, such as:

  • Electrical installations in industrial environments or large buildings.
  • Pressure equipment such as steam boilers and pressure tanks.
  • Environmentally impactful installations, such as cooling systems with specific refrigerants.
  • Lifting and hoisting equipment, such as lifts and cranes.
  • Explosion-hazardous installations, such as storage tanks for hazardous substances.
  • Energy installations, such as large-scale solar panels or combined heat and power systems.